Nord Stream Race Regatta 2019




Nord Stream Race Regatta 2019


June 22 – July 5, 2019


The eighth season of the largest Baltic open sea regatta Nord Stream Race (NSR) will take place from June 22 to July 5, 2019. Russia will be represented by the winning team of the Top Division of National Sailing League 2018 (NSL) – “Leviathan” (Moscow / Saint-Petersburg). Vadim Yakhinson, Maxim Titarenko, Mikhail Sheremetyev, and Maxim Sheremetyev comprised the team at NSL 2018 competitions.

The largest Baltic offshore regatta Nord Stream Race, which was called so because of the pipeline with the same name, that united Russia and Europe in 2012, will cover five countries in the new season. After the start in the German city of Kiel, the regatta’s fleet will visit Copenhagen, Stockholm, Helsinki and will finish in St. Petersburg. Five teams will take the Baltic challenge. They will be formed by the yacht clubs, which won at National Sailing Leagues 2017 in their countries. The participants will race at Club Swan 50 yachts, produced by the famous Finnish shipyard Nautor’s Swan.

According to the Regatta’s Regulations, there will be open sea races and short races in the hosting cities according to the program of Nord Stream Race 2019. Thus, there will be several rankings. The winner of the offshore races will take the longed-for silver cup of Nord Stream Race. The teams, which will demonstrate the best results in the short races and all-around, will be also awarded with special prizes of the regatta.

You can find more detailed information and the regatta's program at the official web-page: www.nord-stream-race.com​

 

Partners of the regatta:

 

Gerenal Partner

 

 

PJSC Gazprom is a global energy company. The main areas of focus are geological exploration, production, transportation, storage, processing and sales of gas, gas condensate and oil, sales of gas as a vehicle fuel, as well as generation and marketing of heat and electric power.

Gazprom views its mission as ensuring a reliable, efficient and balanced supply of natural gas, other energy resources and their derivatives to consumers.

Gazprom holds the world’s largest natural gas reserves. The Company’s share in the global and Russian gas reserves amounts to 17% and 72% respectively. Gazprom accounts for 11% and 66% of the global and national gas output correspondingly.

The company is actively implementing large-scale projects on developing gas deposits of the Yamal Peninsula, the Arctic shelf, Eastern Siberia, and Far East, as well as a number of projects on exploration and development of hydrocarbons abroad.

Gazprom is a reliable supplier of gas to the consumers in Russia and abroad. The company owns the world’s largest gas transportation system with the length of 170.7 thousand km. Gazprom sells more than 50% of gas in Russia. In addition to that, the company supplies gas to more than 30 countries in the near and far abroad.

www.gazprom.com

 

 

 

 

Partner

 

Nord Stream AG is an international joint venture, established for the planning, construction and subsequent operation of the gas pipeline, consisting of two strings and going at the bottom of the Baltic Sea. Russian company PJSC Gazprom holds 51% of the shares of the joint venture. The German companies BASF SE/Wintershall Holding GmbH and PEG Infrastruktur AG (PEGI/E.ON subsidiary) hold 15.5% each, and the Dutch gas infrastructure company N.V. Nederlandse Gasunie together with the leading French energy company ENGIE have 9% of stock each. The headquarters and operational center of Nord Stream are located in Zug, Switzerland.

Two strings of the Nord Stream pipeline go at the bottom of the Baltic Sea and have a capacity to transport 55 billion cubic meters (bcm) of Russian gas to the EU a year, for at least 50 years. Both strings run in parallel for 1,224 kilometers from the Portovaya Bay near Vyborg on the Russian coast of the Baltic Sea to Lubmin in Germany. Each pipeline consists of almost 100,000 concrete-coated steel pipes, 24 tons heavy each, laid on

the seabed along the precise route approved by the authorities of the five countries, which waters the pipeline passes through. The construction of the first Nord Stream Pipeline started in April 2010, and both strings were completed according to the schedule and budget in October 2012, on schedule and on budget.

 

www.nord-stream.com

 

Organised by

 

Saint Petersburg regional sports non-governmental organization “Saint Petersburg Yacht Club” was established in 2007. The main goal is to preserve the principals of nautical ethics on land and sea, to develop sailing sport and encourage people to sail. The philosophy of the Yacht Club is based on the necessity to preserve the heritage of nautical culture and naval history of Russia and the world and pass it over to the next generations.

  теги:  NSR